Manufacturing Plant, Portsmouth

Manufacturing Plant, Portsmouth

Client: Classified

Background: TSL were invited to provide an independent proposal for the roof refurbishment of a manufacturing premises in Portsmouth. By understanding the existing roof condition and internal logistics, TSL were able to provide a long-term solution for the roof refurbishment which offered minimal impact to the day to day running’s.

Scope Of Service: Roof refurbishment including thermal upgrades & rooflight replacement

Form Of Contract: Bespoke

Manufacturing Facilities, Roofing in Portsmouth

Manufacturing facilities offer a unique product into a critical environment and as such would be financially detrimental if operations were halted at any point. TSL had to accommodate and incorporate this into the refurbishment works. Facilities had fortnightly shut downs which enabled TSL to complete all internal works and glazing replacements were completed when the areas were vacated.

While the existing roofing system is considered fragile and dangerous due to its asbestos content, TSL managed this risk as part of the refurbishment proposal. Through encapsulating the existing system, building exposure was eliminated while roof refurbishment works could continue in conjunction with operations internally. The works consisted of a hybrid system of spacer bar, with mineral wool insulation and single skin sheet as well as a composite insulated panel with translucent poloycarbonate roof light sheets.

This posed a particular difficult challenge due to the requirement to removed the existing Georgian wire glass roof lights whilst the floor remained live. A safe, segregated system of works was introduced to accomplish a speed and clean replacement while having minimum disruption to the floor.

To appropriately manage the risk of airborne asbestos, TSL employed specialist air monitoring technicians which ensured the safety of building occupants was paramount. Through monitoring the air content before, during and after works TSL could manage the works appropriately and continue to reassure building occupants.

Paramount to the roof refurbishment programme was TSL’s non-working management. Their full-time capacity on site allowed communication between operatives at roof level, internal occupants and manufacturing management to be efficient and free flowing, ensuring that any and all issues were raised and addressed in the first instance.

Related case studies

Twickenham Stadium, Twickenham TSL undertook the full refurbishment to the North & West Stands at the home of English rugby, via the facility management company responsible for the stadium. The existing sheets were tired and had surpassed their serviceable life, allowing the RFU to consider an improved UV stable sheet, that carried a superior level […]

The client brief consisted of an entire facial uplift to the main entrance & external facade of the hotel, to be completed alongside the internal refurbishment of this wing of the building. An important part of this scheme was being involved with the clients design team from the start, this enabled us to work with […]

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels. The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired […]

Latest News

Welcome to the team Charlie Pidgley!

This is an exciting addition to the team, Charlie has some great experience working with some high profile companies and …

Read More >

TSL Partners up with the ethical blue Co-op

We’re thrilled to announce we have now finalised our partnership agreement with a recognised retailer who pride themselves on ethical …

Read More >

New Project Secured

Looking forward to starting the cladding remediation works on this apartment block, improving it beyond the current regulations. This is …

Read More >