Double Tree By Hilton, Docklands

Double Tree By Hilton, Docklands

Client: Shiva Ltd

Background: TSL's orginal attendance was to reinstall a fallen cladding panel, from this it became evident that the system was beyond its serviceable life and required repalcement.

Scope Of Service: Full design & replacement of the façade, all planning & structural scope undertaken, Inclusive of Building Control & Architectural responsibilities

Form Of Contract: JCT Design & Build

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels.

The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired outcome.

To aid our design process and ensure we captured the correct curve of the building, we commissioned a laser survey to map the contours and cross reference the data we already had.

Another constraint faced with this project was a the close proximity to the TFL’s DLR line. This is located on a bridge that run’s alongside the front of the hotel and directly adjacent to the north section of the works. To accommodate this we had to submit a detailed plan of works with a restricted boom on the machine to mitigate any fall risk on the line.

As noted above, we carried out these works in unusual times and were in some sense fortunate to only deal with a partially occupied building of healthcare professionals who were unable to go home due to risk of infection to their families and as such received no noise complaints as we adapted our working procedure to suit all stakeholders.

We delivered on time, in budget and have a happy client whom has asked us to carry out similar projects on other building within the greater London area in 2021.

Related case studies

The client brief consisted of an entire facial uplift to the main entrance & external facade of the hotel, to be completed alongside the internal refurbishment of this wing of the building. An important part of this scheme was being involved with the clients design team from the start, this enabled us to work with […]

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels. The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired […]

Manufacturing Facilities, Roofing in Portsmouth Manufacturing facilities offer a unique product into a critical environment and as such would be financially detrimental if operations were halted at any point. TSL had to accommodate and incorporate this into the refurbishment works. Facilities had fortnightly shut downs which enabled TSL to complete all internal works and glazing […]

Latest News

Congratulations!!

It is with great pleasure that we have the opportunity to brighten up this Monday morning with some fantastic news, …

Read More >

Welcome to the team!

This is an exciting addition to the team, Charlie has some great experience working with some high profile companies and …

Read More >

TSL Partners up with the ethical blue Co-op

We’re thrilled to announce we have now finalised our partnership agreement with a recognised retailer who pride themselves on ethical …

Read More >