Background: The original client brief was to investigate water ingress issues that had been plaguing the building for some time.

Scope Of Service: Investigations leading to full design & refurbishment of the top inverted roof area with a cold applied liquid waterproofing system with a 20 year guarantee.

Form Of Contract: Purchasing Contract

The tenant of the building at the time were Facebook, so the amount of personnel and computer equipment in the building was vast, creating a high risk to the operation of the business. It was discovered that the inverted roof system was installed over an old asphalt system which had come to the end of its serviceable life.

The decision was made by the client to take the opportunity to install a cold applied liquid waterproofing system to the entire area. This would give the roof a new 20 year guarantee alongside peace of mind that the tenants equipment would remain safe from damage and the building fabric would not be damaged any further.

The works were phased in to 2 sections due to the vast amount of stone on the roof, meaning it had to be transferred to each side to accommodate the install. Due to the logistical constraints of the project, the waste had to be disposed of immediately via waiting loads.

Equally materials being delivered had to be done on a ‘just in time’ style of working. This forced a robust and strict programme with key milestones that could not be missed.

Related case studies

The client brief consisted of an entire facial uplift to the main entrance & external facade of the hotel, to be completed alongside the internal refurbishment of this wing of the building. An important part of this scheme was being involved with the clients design team from the start, this enabled us to work with […]

We completed this project during lockdown 1.0 and we thoroughly enjoyed what is typically a complicated project due to the curved nature of the existing substrate and subsequent panels. The curved nature of the building requires a pinpoint accurate design & procurement period to ensure the panels are created millimeter perfect to achieve the desired […]

Manufacturing Facilities, Roofing in Portsmouth Manufacturing facilities offer a unique product into a critical environment and as such would be financially detrimental if operations were halted at any point. TSL had to accommodate and incorporate this into the refurbishment works. Facilities had fortnightly shut downs which enabled TSL to complete all internal works and glazing […]

Latest News

Congratulations!!

It is with great pleasure that we have the opportunity to brighten up this Monday morning with some fantastic news, …

Read More >

Welcome to the team!

This is an exciting addition to the team, Charlie has some great experience working with some high profile companies and …

Read More >

TSL Partners up with the ethical blue Co-op

We’re thrilled to announce we have now finalised our partnership agreement with a recognised retailer who pride themselves on ethical …

Read More >